File #: R-2020-253    Version: 1 Name: FEMA Generator design for LS & PS
Type: Resolution Status: Passed
File created: 9/1/2020 In control: Department of Public Utilities
On agenda: 10/7/2020 Final action: 10/7/2020
Title: A Resolution Of The City Commission Of The City Of Hollywood, Florida, Ranking Professional Consulting Engineering Firms And Authorizing The Appropriate City Officials To Execute A Consultant Services Agreement With The Two Highest Ranked Firms, Kimley-Horn And Associates, Inc. And Craven Thompson & Associates, Inc., To Provide Design And Construction Administration Services For The Installation Of Generators At Sanitary Sewer Lift Stations No. E-01, E-03, E-06, W-14, W-15 and Stormwater Pump Station SW-08 In The Lump Sum Amounts Of $179,361.00 And $234,273.52, Respectively.
Attachments: 1. 01 Resolution - FEMA Generator design for LS & PS.pdf, 2. 02 Consultant Agreement for Craven Thompson & Assoc. - FEMA Generator Design for LS & PS.pdf, 3. 02a Draft ATP - CTA 20-02 - FEMA Generator Design for LS & PS.pdf, 4. 03 Consultant Agreement for Kimley-Horn & Assoc. - FEMA Generator Design for LS & PS.pdf, 5. 03a Draft ATP - KHA 20-02 - FEMA Generator Design for LS & PS.pdf, 6. 04 Proposal Craven Thompson & Assoc. - FEMA Generator Design for LS & PS.pdf, 7. 05 Proposal Kimley-Horn & Assoc. - FEMA Generator Design for LS & PS .pdf, 8. 06 Craven Thompson & Assoc. RFQ - FEMA Generator Design for LS & PS.pdf, 9. 07 Kimley-Horn RFQ - FEMA Generator Design for LS & PS.pdf, 10. 08 Bailey Engineering RFQ - FEMA Generator Design for LS & PS.pdf, 11. 09 Baxter-Woodman, Inc. RRQ - FEMA Generator Design for LS & PS.pdf, 12. 10 CSA Central RFQ - FEMA Generator Design for LS & PS.pdf, 13. 11 SGM Engineering, Inc. RFQ - FEMA Generator Design for LS & PS.pdf, 14. 12 Resolution R-2019-158 (Executed).pdf, 15. 13 Resolution R-2019-259 (Executed).pdf, 16. 14 RFQ Final Ranking Results - FEMA Generator Design for LS & PS.pdf, 17. TermTermSheetRankingFirmsandContractCCNAKIMLEYHORNDESIGNCONSTADMINSERVICESFEMAGENERATORS.pdf

Title

A Resolution Of The City Commission Of The City Of Hollywood, Florida, Ranking Professional Consulting Engineering Firms And Authorizing The Appropriate City Officials To Execute A Consultant Services Agreement With The Two Highest Ranked Firms, Kimley-Horn And Associates, Inc. And Craven Thompson & Associates, Inc., To Provide Design And Construction Administration Services For The Installation Of Generators At Sanitary Sewer Lift Stations No. E-01, E-03, E-06, W-14, W-15 and Stormwater Pump Station SW-08 In The Lump Sum Amounts Of $179,361.00 And $234,273.52, Respectively.

 

 

Strategic Plan Focus

Infrastructure & Facilities

 

 

Body

 

Staff Recommends: Approval of the attached Resolution.

 

 

Explanation:

Hazard Mitigation Grant Program ("HMGP") provides funding for technically feasible, cost-effective activities that reduce or eliminate long-term risk to people and property from natural hazards and their effects. Broward County (“County”) has been designated as one of the Local Mitigation Strategy Working Group participating entities that coordinates mitigation activities within the County.  It works with local stakeholders, including the City of Hollywood, to identify, prioritize, and select eligible mitigation activities to be submitted for funding consideration under the HMGP.

On June 5, 2019, the City Commission passed and adopted Resolution No. R-2019-158, which authorized the appropriate City officials to apply for a grant for two (2) new generators, one each for Sanitary Sewer Lift Stations No. E-01 and W-15 in the amount of $994,000.00 and if awarded, accept Federal Funds from HMGP. This grant required the City to commit a 25% match or $248,500. 

On September 4, 2019, the City Commission passed and adopted Resolution No. R-2019-259, which authorized the appropriate City officials to apply for a grant for four (4) new generators, one each for Sanitary Sewer Lift Stations No. E-3, E-6, W-14, and Storm Water Pump Station SW-08 and an additional 25% Federal Fund contribution for the generator for Sanitary Sewer Lift Station No. W-15 in the total grant amount of $2,086,000.00 and if awarded, to accept Federal Funds from the HMGP.  This grant required the City to commit a 32% match or $667,520. 

Subsequently the Department of Public Utilities was awarded the above two (2) grants from HMGP. 

 

To comply with the Grant requirements, the Department of Public Utilities needs to retain professional consulting engineering firms.  The Department of Public Utilities followed the procedures set forth in Section 287.055, Florida Statutes entitled “Consultants’ Competitive Negotiation Act” (“CCNA”), and the City’s Purchasing ordinance to advertise for statement of qualifications for design and construction administration services for installation of the generators.

On May 28, 2020, the Office of the City Clerk and the Department of Public Utilities received statement of qualification packages from the following six (6) consulting engineering firms:

1.                     Bailey Engineering Consultants, Inc.

2.                     Baxter & Woodman, Inc.

3.                     Craven Thompson & Associates, Inc.

4.                     CSA Central, Inc. (CSA Group)

5.                     Kimley-Horn and Associates, Inc.

6.                     SGM Engineering, Inc.

 

The Department of Public Utilities assembled a selection committee composed of five (5) City of Hollywood staff:  Clece Aurelus, Kellvy Angeles, Phyllis Shaw, Feng Jiang, and Vernal Sibble.  On June 25, 2020, members of the selection committee met to evaluate and to rank the statements of qualifications.

The selection committee completed the evaluation process and ranked the firms based upon the stipulated guidelines/criteria in the statement of qualifications package as follows:

 

No.                                          Consultant                                                                                                                              Score                     Rank

 1                                          Kimley-Horn and Associates, Inc.                                            465                                              1st

 2                                          Craven Thompson & Associates, Inc.                                            452                                              2nd

 3                                          SGM Engineering, Inc.                                                                                      414                                              3rd

 4                                          Baxter & Woodman, Inc.                                                                                      399                                              4th

 5                                          Bailey Engineering Consultants, Inc.                                            397                                              5th

 6                                          CSA Central, Inc. (CSA Group)                                                                 392                                              6th

 

The Department of Public Utilities recommends that the City Commission authorizes the appropriate City officials to execute the attached professional engineering consultant services agreements with the two (2) highest ranked firms.  Kimley-Horn and Associates, Inc. will perform the design and construction administration services related to the Installation of Generators at Sanitary Sewer Lift Stations Nos. E-03 and E-06 and Stormwater Pump Station SW-08. Craven Thompson & Associates, Inc. will perform the design and construction administration services related to the Installation of Generators at Sanitary Sewer Lift Stations Nos. E-01, W-14 and W-15.  The contract term for the Project is estimated to be two years with an option to renew for two additional one year periods.

 

The Department of Public Utilities staff will manage this project.  No additional staff is needed as a result of this project.

 

Fiscal Impact

Funding for this project was included in the FY 2020 Capital Improvement Plan and is available in account numbers 442.409801.53600.564530.001231.000.000 and 442.409901.53600.564530.001232.000.000.

 

 

 

Recommended for inclusion on the agenda by:

Vivek Galav, Director, Department of Public Utilities

Gus Zambrano, Assistant City Manager/Sustainable Development

 

 

Attachments

01                     Resolution - FEMA Generator design for Lift Stations & SW Pump Station

02                     Consultant Agreement - Craven Thompson & Assoc. - FEMA Generator Design for Lift Stations & SW Pump Station

02a                     Draft ATP - CTA 20-02 - FEMA Generator Design for LS & PS

03                     Consultant Agreement - Kimley-Horn - FEMA Generator Design for Lift Stations & SW Pump Station

03a                     Draft ATP - KHA 20-02 - FEMA Generator Design for LS & PS

04                     Proposal - Craven Thompson & Assoc. - FEMA Generator Design for Lift Stations & SW Pump Station

05                     Proposal - Kimley-Horn & Assoc. - FEMA Generator Design for Lift Stations & SW Pump Station

06                     RFQ - Craven Thompson & Assoc. - FEMA Generator Design for Lift Stations & SW Pump Station

07                     RFQ - Kimley-Horn & Assoc. - FEMA Generator Design for Lift Stations & SW Pump Station

08                     RFQ - Bailey Engineering - FEMA Generator Design for Lift Stations & SW Pump Station

09                     RFQ - Baxter-Woodman, Inc. - FEMA Generator Design for Lift Stations & SW Pump Station

10                     RFQ - CSA Central - FEMA Generator Design for Lift Stations & SW Pump Station

11                     RFQ - SGM Engineering, Inc. - FEMA Generator Design for Lift Stations & SW Pump Station

12                     Resolution No. R-2019-158 (Executed) - FEMA Generator Design for Lift Stations & SW Pump Station

13                     Resolution No. R-2019-259 (Executed) - FEMA Generator Design for Lift Stations & SW Pump Station

14                     RFQ Final Ranking Results - FEMA Generator Design for LS & PS