Hollywood FL banner
File #: R-2018-344    Version: 1 Name: MOA Park Rd Mobility 431770-5-52-01 And 431770-5-52-02
Type: Resolution Status: Passed
File created: 9/4/2018 In control: Engineering Division
On agenda: 11/7/2018 Final action: 11/7/2018
Title: A Resolution Of The City Commission Of The City Of Hollywood, Florida, Approving And Authorizing The Appropriate City Official to Execute A Highway Maintenance Memorandum Of Agreement With The Florida Department Of Transportation (FDOT) For The Construction Of Sidewalk And Bicycle Lane Improvements By FDOT For Certain Projects Identified In The Five-Year Adopted Work Program Which Fall Within The City's Jurisdictional Right Of Way, More Specifically; Park Road, 35th Avenue, Polk Street, Rainbow Drive, Circle Drive, And Van Buren Street Bike Lanes, And Other Mobility Improvements Project Nos. 431770-5-52-01 And 431770-5-52-02.
Attachments: 1. En18-168 Park Rd. Mobility Project.docReso_MOA.pdf, 2. 431770-5_HMMOA (Legal Reviewed).pdf, 3. TermSheetFDOTHIGHWAYMAINTAGSIDEWALKBICYLANE2018, 4. BIS 18-299.pdf

Title

A Resolution Of The City Commission Of The City Of Hollywood, Florida, Approving And Authorizing The Appropriate City Official to Execute A Highway Maintenance Memorandum Of Agreement With The Florida Department Of Transportation (FDOT) For The Construction Of Sidewalk And Bicycle Lane Improvements By FDOT For Certain Projects Identified In The Five-Year Adopted Work Program Which Fall Within The City’s Jurisdictional Right Of Way, More Specifically; Park Road, 35th Avenue, Polk Street, Rainbow Drive, Circle Drive, And Van Buren Street Bike Lanes, And Other Mobility Improvements Project Nos. 431770-5-52-01 And 431770-5-52-02.

 

Body

 

Staff Recommends:

 

 

Explanation:

The City of Hollywood continues to strive to fulfill its long-term vision to significantly enhance safety, mobility and provide transportation options for its citizens and visitors throughout the City, and has determined that a Complete Streets project would meet that vision.  The City has coordinated closely with the Florida Department of Transportation, which actively supports local governments in implementing Complete Streets projects structured to enhance mobility for non-motorized road users. 

 

FDOT has secured funding in the amount of $3,016,098.00 from the Federal Highway Administration (FHWA) to design and construct such a project along the aforementioned corridors on behalf of the City.  It is anticipated that there will be aspects/components that do not qualify for the use of Federal funding for this project, such as tree relocation and tree removal mitigation, as well as annual operating and maintenance costs, the City will be required to fund these elements in an estimated amount of $80,000.00 for FY 2020.  The projected locations for Mobility Improvements at Various Locations Bike Lane and Bike Path Bike Project Nos. 431770-5-52-01 and 431770-5-52-02, for providing for the construction of bike lanes along:

 

                     N. Park Road From Hollywood Boulevard To Johnson Street;

                     S. Park Road From Washington Street To Hollywood Boulevard;

                     35th Avenue From S. Rainbow Drive To Johnson Street;

                     Fillmore Street From N 62nd Avenue To State Road 7: sidewalks;

                     Polk Street At N. 24th Avenue pedestrian safety upgrades;

                     Van Buren Street At S. 24th Avenue: pedestrian safety upgrades;

                     Hollywood Boulevard From E. of 28th Avenue To W. Of City Hall Circle: mid-block crossing safety upgrades;

                     Polk Street From N. 56th Avenue To N. Circle Drive;

                     N. Rainbow Drive From N. Circle Drive To N. 35th Avenue;

                     N. Circle Drive From Polk Street To N. Rainbow Drive;

                     Van Buren Street From S. 56th Avenue To S. Circle Drive;

                     S. Circle Drive From Van Buren Street To S. Rainbow Drive;

                     S. Rainbow Drive From S. Circle Drive To East Of S. 35th Avenue;

                     Hollywood Boulevard From Academy Circle To 35th Avenue;

 

The Florida Department of Transportation requires that the City execute a Highway Maintenance Memorandum of Agreement to formally assume responsibility for funding those elements that are ineligible for Federal funding in order to move forward with this project, which must be sanctioned by means of a Resolution of Support from the City of Hollywood.

 

Recommended for inclusion on the agenda by:

Dr. Wazir Ishmael, City Manager

Gus Zambrano, Assistant City Manager/Sustainable Development

Shiv Newaldass, Interim Director, Development Services

Luis Lopez, P.E., City Engineer