Hollywood FL banner
File #: R-2015-220    Version: 1 Name: WMR Hollywood Boulevard to Sheridan
Type: Resolution Status: Passed
File created: 6/1/2015 In control: Department of Public Utilities
On agenda: 7/8/2015 Final action: 7/8/2015
Title: A Resolution Of The City Commission Of The City Of Hollywood, Florida, Authorizing The Appropriate City Officials To Execute The Attached Contract Between Giannetti Contracting Corporation And The City Of Hollywood For Construction Services Related To The Water Main Replacement Program From Hollywood Boulevard To Sheridan Street Between Federal Highway (US-1) And The Intracoastal Waterway, As Identified In The 2007 Water System Master Plan And As Part Of The City-Wide Water Main Replacement Program, And For Miscellaneous Stormwater Improvements, In The Amount Of $13,689,489.38; And To Amend The Approved Fiscal Year 2015 Capital Improvement Program, As Set Forth In Exhibit A (City Project No. 13-5119).
Attachments: 1. Resolution - WMR Hollywood to Sheridan.pdf, 2. Exhibit A - WMR Hollywood to Sheridan.pdf, 3. Contract - WMR Hollywood to Sheridan.pdf, 4. Bid Tab - Hollywood to Sheridan.pdf, 5. Bid - Giannetti Contracting Corp.pdf, 6. Bid - ROHL Networks, LP.pdf, 7. Bid - JVA.pdf, 8. Bid - Man-Con.pdf, 9. Term Sheet - Giannetti Contracting Corp. - Water Main Replacement - 2.pdf, 10. BIS 15-203.pdf
Title
A Resolution Of The City Commission Of The City Of Hollywood, Florida, Authorizing The Appropriate City Officials To Execute The Attached Contract Between Giannetti Contracting Corporation And The City Of Hollywood For Construction Services Related To The Water Main Replacement Program From Hollywood Boulevard To Sheridan Street Between Federal Highway (US-1) And The Intracoastal Waterway, As Identified In The 2007 Water System Master Plan And As Part Of The City-Wide Water Main Replacement Program, And For Miscellaneous Stormwater Improvements, In The Amount Of $13,689,489.38; And To Amend The Approved Fiscal Year 2015 Capital Improvement Program, As Set Forth In Exhibit A (City Project No. 13-5119).


Body

Staff Recommends: Approval of the attached Resolution.


Explanation:
The 2007 Water System Master Plan identified the need to replace aging infrastructure throughout the City of Hollywood and to install additional infrastructure to improve the level of service within the City's water system.

The City-wide Water Main Replacement Program identified the need to replace old water distribution infrastructure and install 4-inch diameter through 24-inch diameter water mains within the area surrounded by Hollywood Boulevard and Sheridan Street and North Federal Highway (US-1) and the Intracoastal Waterway.

In conjunction with the water main replacement project, miscellaneous stormwater improvements will be installed within the boundary of the project.

On July 17, 2013, via Resolution R-2013-215, the City Commission approved a proposal from Tetra Tech, in the amount of $953,552.00, to provide engineering design services, permitting services, bidding recommendation services, and limited engineering services during construction for the Water Main Replacement Program within the area surrounded by Hollywood Boulevard and Sheridan Street and North Federal Highway (US-1) and the Intracoastal Waterway.

On April 10, 2015, the Department of P...

Click here for full text