File #: R-2026-113    Version: 1 Name: DCM - Holland Park Docks - Thaler
Type: Resolution Status: Agenda Ready
File created: 3/9/2026 In control: Department of Design & Construction Management
On agenda: 4/6/2026 Final action:
Title: A Resolution Of The City Commission Of The City Of Hollywood, Florida, Approving And Authorizing The Appropriate City Officials To Execute A Contract With Thaler Contracting, Inc. For The Holland Park Dock Removal And Installation Project, In An Amount Up To $206,457.18, In Accordance With Section 38.41(C)(9) Of The Procurement Code. (Best Interest)
Attachments: 1. Resolution - Holland Park Dock Replacement.pdf, 2. Contract Form - Holland Park Docks, 3. General Conditions - Holland Park Docks, 4. Supplementary General Conditions - Holland Park Docks, 5. GC License Exp 8-31-26.pdf, 6. Proposal_802_from_THALER_CONTRACTING_INC, 7. Auto Insurance Coverage.pdf, 8. TC COI exp 3-13-27.pdf, 9. Thaler COI - General Liability.pdf, 10. WC Exemption Exp 3-27-28.pdf, 11. WC exemption Exp 3-28-26.pdf, 12. Term Sheet - Holland Park Dock Removal and Installation Project_Thaler Contracting, Inc.- GENERAL
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
A Resolution Of The City Commission Of The City Of Hollywood, Florida, Approving And Authorizing The Appropriate City Officials To Execute A Contract With Thaler Contracting, Inc. For The Holland Park Dock Removal And Installation Project, In An Amount Up To $206,457.18, In Accordance With Section 38.41(C)(9) Of The Procurement Code. (Best Interest)

Strategic Plan Focus
Infrastructure & Facilities


Body

Staff Recommends: Approval of the attached Resolution.


Explanation:
The Department of Design and Construction Management ("DCM") requests approval to authorize the appropriate City officials to execute a Contract with Thaler Contracting, Inc. in an amount up to $206,457.18 for the Holland Park Dock Removal and Installation Project, utilizing the Best Interest procurement method.

This project consists of the removal and replacement of six existing finger docks at Holland Park. The scope includes demolition and disposal of the existing finger docks and associated components; site cleanup; furnishing and installation of one 6' x 30' floating dock, five 6' x 20' floating docks, six aluminum gangway ramps, and 12 prestressed concrete pilings; installation of composite Wolf decking to match previously installed rowing docks; non-skid decking and aluminum railings on ramps; pile hoops with rollers; aluminum cleats; heavy-duty bump strips; additional flotation; and all required permitting with applicable regulatory agencies.

Thaler Contracting, Inc. recently completed adjacent dock improvements at this same location, including installation of a floating dock and ramp serving the Hollywood Rowing Club. That work required coordination with City, State, and federal regulatory agencies due to the site's proximity to the Intracoastal Waterway and was completed successfully.

Although the six finger docks are not physically attached to the previously completed dock, they are immediately adjacent and function within the same dock area. Utilizing the same contract...

Click here for full text