Title
A Resolution Of The City Commission Of The City Of Hollywood, Florida, Approving And Authorizing The Appropriate City Officials To Execute An Authorization To Proceed For Work Order Number H&S 26-06 With Hazen And Sawyer, P.C. To Provide Professional Engineering Consulting Services For Capacity Evaluation And Preliminary Design Phase 1 For The Lift Station E-03 Upgrade Project In An Amount Up To $291,078.00.
Strategic Plan Focus
Infrastructure & Facilites
Body
Staff Recommends: Approval of the attached Resolution.
Explanation:
The Department of Public Utilities ("Department") has the responsibility for planning, regulating, designing, constructing, operating, and maintaining a wastewater collection system that includes 86 sewer lift stations. The Department desires to obtain professional engineering consulting services to assist with the capacity evaluation and preliminary design of the Lift Station E-03 Upgrade project.
The lift station E-03, constructed in 1957 and upgraded in 1982, is currently experiencing challenges in managing peak flow levels during storm events without reliance on the standby pumping unit. To address these issues, complete rehabilitation of the lift station E-03 is planned to take place within the next five to ten years. The proposed development within the service area is projected to result in a substantial increase in influent flow over the next few years. To effectively accommodate this anticipated beach development, we will implement necessary adjustments during the interim period leading up to rehabilitation. This approach is designed to ensure we can manage the increased capacity efficiently and sustainably.
On August 30, 2023, the City Commission passed and adopted Resolution No. R-2023-251, which authorized the execution of Continuing Professional Engineering Services Agreements with five firms for water, sewer, reuse, and stormwater infrastructure projects, one of the firms being Hazen and Sawyer, P.C.("H...