File #: R-2022-175    Version: 1 Name: ATP H&S 22-05 Clarifier No. 3 Repair
Type: Resolution Status: Passed
File created: 5/18/2022 In control: Department of Public Utilities
On agenda: 6/15/2022 Final action: 6/15/2022
Title: A Resolution Of The City Commission Of The City Of Hollywood, Florida, Approving And Authorizing The Appropriate City Officials To Execute An Authorization To Proceed For Work Order No. H&S 22-05 With Hazen And Sawyer, P.C. To Provide Professional Engineering Services In An Amount Not To Exceed $45,333.00 For The Design, Permitting And Bidding Services Relating To The Repair Of Clarifier No. 3 At The Southern Regional Wastewater Treatment Plant.
Attachments: 1. Resolution - ATP H&S 22-05 Clarifier No. 3 Repair at SRWWTP.pdf, 2. ATP - H&S 22-05 Clarifier No. 3 Repair at SRWWTP.pdf, 3. Proposal - ATP H&S 22-05 Clarifier No. 3 Repair at SRWWTP.pdf, 4. Agreement Renewal - ATP H&S 22-05 Clarifier No. 3 Repair at SRWWTP.pdf, 5. Sunbiz Detail by Entity Name - ATP H&S 22-05 Clarifier No. 3 Repair.pdf, 6. TermSheetATPHazenSawyerClariferNo3..pdf
Title
A Resolution Of The City Commission Of The City Of Hollywood, Florida, Approving And Authorizing The Appropriate City Officials To Execute An Authorization To Proceed For Work Order No. H&S 22-05 With Hazen And Sawyer, P.C. To Provide Professional Engineering Services In An Amount Not To Exceed $45,333.00 For The Design, Permitting And Bidding Services Relating To The Repair Of Clarifier No. 3 At The Southern Regional Wastewater Treatment Plant.


Strategic Plan Focus
Infrastructure & Facilities


Body
Staff Recommends: Approval of the attached Resolution.


Explanation:
The Department of Public Utilities owns, operates, and maintains the Southern Regional Wastewater Treatment Plant ("SRWWTP") and recently defined the need to repair and return Clarifier No. 3 to service. The existing Clarifier No. 3, constructed in 1975, has failed recently due to a broken elbow joint and pipe segment of the 24-inch return activated sludge pipe located at the base of the clarifier mechanism, below grade and within the 48-inch clarifier feed line.

Due to location of the failure, the entire clarifier mechanism must be dismantled, removed and then re-installed once repairs are completed. Because of the age of the clarifier mechanism, it is possible that the dismantled mechanism may be required to be replaced depending on the degradation of the clarifier mechanism. The scope of this Work Order No. H&S 22-05 is to prepare contract documents for the repair of Clarifier No. 3 and plan for the potential replacement of its mechanism.

The Department of Public Utilities ("Department") staff requested and negotiated a proposal from Hazen and Sawyer for professional engineering services required for the design, permitting, and bidding services related to the repair of Clarifier No. 3 at the SRWWTP in an amount not to exceed $45,333.00. Department staff evaluated the scope and fee and have determined that the negotiated fee is fair and reasonable and in accordance with industry...

Click here for full text