Title
A Resolution Of The City Commission Of The City Of Hollywood, Florida, Approving And Authorizing The Appropriate City Officials To Execute An Authorization To Proceed For Work Order Number CEI 26-01 With Carollo Engineers, Inc. For Professional Engineering Services Related To The Water Treatment Plant Maintenance Package C Projects In An Amount Up To $239,169.60.
Strategic Plan Focus
Infrastructure & Facilites
Body
Staff Recommends: Approval of the attached Resolution.
Explanation:
The Department of Public Utilities ("Department") maintains and operates a 59.5 million gallons per day Water Treatment Plant ("WTP"), located at 3441 Hollywood Boulevard, Hollywood, Florida. Several assets at the WTP need maintenance, repair, or replacement.
These projects have been identified by the Department as WTP Maintenance Package C and include the following items:
* Western/Chaminade Wellfield - Wells 36 and 41
o Perform well-condition assessments
o Develop well rehabilitation or replacement plan
* Floridan Wellfield - Wells F2 and F4
o Perform well-condition assessments
o Develop well rehabilitation or replacement plan
* Design exterior crack repairs for the following areas:
o Pump Vault (Thickener/Holding Tank)
o Filter Gallery
o Back Wash Pump No. 2/Clear Well penetration
o Blend Tank
o Reclaim Pumps (confined space - east and west sides)
* High Service Pump (HSP) /North Header
o Design for the replacement of the existing east and west isolation valves
* High Service Pump (HSP) /West Header
o Design for the replacement of the existing 14-inch check valve
On August 30, 2023, the City Commission passed and adopted Resolution No. R-2023-251, which authorized the execution of continuing professional consulting engineering services contracts with five firms for water and wastewater treatment plant projects, one of the firms being Carollo Engineers, Inc. ("Carollo").
Department staff requested a proposal from Carollo to provide professional engineering serv...