A Resolution Of The City Commission Of The City Of Hollywood, Florida, Approving And Authorizing The Appropriate City Officials To Execute Change Order No. 2 With Man Con, Incorporated In The Amount Of $990,690.78 For The Parkside Water Main Replacement Project, Resulting From Changes To The Design And Unforeseen Site Conditions, And Authorizing Payment By Utilizing Funds Remaining In Seven Unused Payment Items And Water Main Contingency Resulting In No Net Change To The Contract Amount.
Strategic Plan Focus
Infrastructure & Facilites
Body
Staff Recommends: Approval of the attached Resolution.
Explanation:
The City's water distribution system consists of over 600 miles of pipelines with diameters ranging from 2-inches to 36-inches. The 2007 Water System Master Plan identified the need to replace aging infrastructure throughout the City and install additional infrastructure to improve the level of service within the City's water system. The Citywide Water Main Replacement Program as outlined in the 2007 Water System Master Plan prioritizes the replacement of the water mains based on the age of the pipelines, type of pipe material, repeated pipeline breaks in the areas, and water quality issues. The Water Main Replacement Program identified the need to replace old water distribution infrastructure and install 4-inch diameter through 12-inch diameter water mains within the area surrounded by Pembroke Road to Hollywood Boulevard and between South 21st Avenue and South Federal Highway, referred to as the "Parkside Water Main Replacement" project.
On December 2, 2020, pursuant to Resolution No. R-2020-321, the City Commission authorized the execution of a contract with Man Con, Incorporated ("Contractor") for construction services related to the Parkside Water Main Replacement project, in the amount of $9,740,234.00, which includes a $1,000,000.00 contingency allowance related to water main replacement.
On May 4, 2021, the Department of Public Util...