Legislation Details

File #: R-2026-191    Version: 1 Name: I&I Phase 2 Services Agreement with Hazen and Sawyer
Type: Resolution Status: Agenda Ready
File created: 5/13/2026 In control: Department of Public Utilities
On agenda: 6/3/2026 Final action:
Title: A Resolution Of The City Commission Of The City Of Hollywood, Florida, Approving And Authorizing The Appropriate City Officials To Authorize A Continuation Of Services Agreement With Hazen And Sawyer, P.C. To Provide Engineering Consulting Services Related To Phase 2 Of The Inflow And Infiltration Reduction Program, In An Amount Not To Exceed $492,239.00.
Attachments: 1. Resolution-H&S Agreement - I&I Program Phase 2 (Legal), 2. Renewal Letter -signed, 3. Proposal - Hollywood Phase 2 I-I Program 1st Year, 4. H&S_Agreement_(Executed) -_Inflow_Infiltration_Program_(6021)_, 5. Consent Order 4-29-2025, 6. R-2022-364 H&S Agreement and ATP H&S 23-05 - I&I Program, 7. R-2023-188 Inflow & Infiltration Agreement, 8. Term Sheet
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
A Resolution Of The City Commission Of The City Of Hollywood, Florida, Approving And Authorizing The Appropriate City Officials To Authorize A Continuation Of Services Agreement With Hazen And Sawyer, P.C. To Provide Engineering Consulting Services Related To Phase 2 Of The Inflow And Infiltration Reduction Program, In An Amount Not To Exceed $492,239.00.

Strategic Plan Focus
Infrastructure & Facilities


Body

Staff Recommends: Approval of the attached Resolution.


Explanation:
The City of Hollywood ("City") operates a large wastewater system that collects and transports sewage to the treatment plant. Over time, cracks, aging pipes, and loose manhole covers allow rainwater and groundwater to leak into the sewer system. This unwanted water is called Inflow and Infiltration ("I&I"). When too much outside water enters the sewer system, it can overload pipes and pump stations, increase the risk of sewer overflows, and raise the cost of wastewater treatment.

To address these issues, the City created a multi-phase I&I Reduction Program.

Phase 1 studied the entire system to identify which neighborhoods and areas have the highest levels of I&I. Hazen and Sawyer, the City's engineering consultant, collected flow data, rainfall information, groundwater levels, and other measurements to determine the most impacted areas.

Phase 2 will now focus on locating the exact points where water is entering the system and recommending the necessary repairs. This work includes smoke testing, manhole inspections, nighttime flow checks, and video inspections of sewer pipes. Phase 2 will also support the City's required compliance with a Florida Department of Environmental Protection Consent Order.

The City selected Hazen and Sawyer through a competitive process to provide engineering services for the I&I Program. They completed Phase 1 and already have an existing approved Professional Services Agreement with the City (R-2023-188) for the I&I Program. Phase 2 continue...