Hollywood FL banner
File #: R-2024-341    Version: 1 Name: DCM- Thermo Air City Hall Chiller
Type: Resolution Status: Passed
File created: 9/3/2024 In control: Department of Design & Construction Management
On agenda: 10/23/2024 Final action: 10/23/2024
Title: A Resolution Of The City Commission Of The City Of Hollywood, Florida, Approving And Authorizing The Appropriate City Officials To Execute A Contract With Thermo Air, Inc. To Provide Construction Services For The Removal And Replacement Of The City Hall Chiller In An Amount Up To $593,700.00.
Attachments: 1. 01. Resolution Thermo_OT.AR_08.13.24.pdf, 2. Agreement Signed.pdf, 3. General Conditions (KimPhan edits) (002).pdf, 4. Supplementary General Conditions (Insurance Update) KimPhan.pdf, 5. 03. Evaluation Tabulation.pdf, 6. 11. IFB hollywood_city_hall_chiller_replacement-2024-08-20-16-24-28.pdf, 7. 04. THERMO AIR INC - Response Document Report.pdf, 8. Second and Final pricing.pdf, 9. FW_ COI - Thermo Air_Acceptance.pdf, 10. Thermo Air.pdf, 11. Thermo Sunbiz.pdf, 12. THERMO LICENSES.pdf, 13. Term Sheet - Thermo Air, Inc_City Hall Chiller - GENERAL.pdf
Title
A Resolution Of The City Commission Of The City Of Hollywood, Florida, Approving And Authorizing The Appropriate City Officials To Execute A Contract With Thermo Air, Inc. To Provide Construction Services For The Removal And Replacement Of The City Hall Chiller In An Amount Up To $593,700.00.

Strategic Plan Focus
Infrastructure & Facilities


Body

Staff Recommends: Approval of the attached Resolution


Explanation:
The second chiller at City Hall is a backup chiller to the main and is no longer functioning and requires replacement.

The chiller scope of work for the project includes removing and replacing the nonfunctioning water-cooled chiller with a new chiller. Isolation valves will be added for the existing condenser water pumps, existing chiller and replacement chiller.

The new chiller will be integrated to the existing building management system. On April 25, 2024, Invitation for Bid ("IFB") Number IFB-195-24-WV was electronically advertised on OpenGov.com to solicit the desired services in accordance with Section 38.43(A) of the Procurement Code.

The IFB resulted in bids from the following seven firms by the response due date:

COMPANY BASE BID
FXP Corporation $600,000
Thermo Air, Inc $627,000
Air-Ways Mechanical Services, LLC $693,330
Advanced Roofing $742,570
Integ Miami, LLC $763,879
Summa Mechanical Contractors, LLC $971,000
Blizzard Air Conditioning $980,000

Upon review of the bids received in response the IFB, FXP Corporation met all bid requirements and was deemed as the lowest-priced responsive and responsible firm.
According to Section 38.51 of the Procurement Code, Local Hollywood Vendor Preference, Thermo Air, Inc. met the requirements of a Local Hollywood Vendor.

Thermo Air, Inc. was allowed to submit a second bid. The total of the second bid is $593,700.00.

DCM and the Office of Procurement and Contract Compliance staff reviewed and evaluated the submitted bids in accorda...

Click here for full text