File #: R-2014-090    Version: 1 Name: RAS Pump Station No. 2 Replacement
Type: Resolution Status: Passed
File created: 3/24/2014 In control: Department of Public Utilities
On agenda: 4/16/2014 Final action: 4/16/2014
Title: A Resolution Of The City Commission Of The City Of Hollywood, Florida Authorizing The Appropriate City Officials To Issue An Authorization To Proceed For Work Order No. H&S 14-03 Between Hazen And Sawyer P.C., And The City Of Hollywood To Provide Professional Engineering Services For The Return Activated Sludge (RAS) Pump Station No. 2 Replacement, Located At The Southern Regional Wastewater Treatment Plant As Identified In The 2007/2008 Wastewater System Master Plan, And To Approve An Amendment To The Fiscal Years 2013 And 2014 Capital Improvement Programs, As Set Forth In Exhibit A, In The Lump Sum Amount Of $65,924.00 (Project No. 14-9522).
Attachments: 1. Resolution - RAS Pump Station No. 2 Replacement.pdf, 2. ATP - RAS Pump Station No. 2 Replacement.pdf, 3. Exhibit A - RAS Pump Station No 2 Replacement.pdf, 4. Proposal - RAS Pump Station No. 2 Replacement.pdf, 5. Term Sheet - Hazen & Sawyer Work Order H&S 14-03 RAS Pump Station No. 2.pdf, 6. BIS14118.pdf
Title
A Resolution Of The City Commission Of The City Of Hollywood, Florida Authorizing The Appropriate City Officials To Issue An Authorization To Proceed For Work Order No. H&S 14-03 Between Hazen And Sawyer P.C., And The City Of Hollywood To Provide Professional Engineering Services For The Return Activated Sludge (RAS) Pump Station No. 2 Replacement, Located At The Southern Regional Wastewater Treatment Plant As Identified In The 2007/2008 Wastewater System Master Plan, And To Approve An Amendment To The Fiscal Years 2013 And 2014 Capital Improvement Programs, As Set Forth In Exhibit A, In The Lump Sum Amount Of $65,924.00 (Project No. 14-9522).

Body

Staff Recommends:
Approval of the attached Resolution.

Explanation:
The 2007/2008 Wastewater System Master Plan identified the need to replace/upgrade the Return Activated Sludge (RAS) pump stations.

The existing Return Activated Sludge (RAS) Pump Station No. 2 was constructed in 1973 and is critical to the proper biological process at the Southern Regional Wastewater Treatment Plant.

Severe cracking of the walls and revisions to the operating levels within the neighboring clarifier trough, in order to meet new regulatory requirements, has provided a pathway for multiple leaks to penetrate the interior of the pump station. The electrical and mechanical equipment has reached the end of its useful life.

The City requested a proposal from Hazen and Sawyer, P.C. to provide Professional Engineering Services for the design, permitting, and bidding services for the proposed RAS Pump Station No. 2 Replacement.

Hazen and Sawyer, P.C. and the City of Hollywood have a Professional Services Agreement for General Engineering Consulting Services for wastewater projects, and this agreement was approved by the City Commission via Resolution No. R-2003-003 on January 8, 2003; amended by the City Commission via Resolution No. R-2012-152 on June 6, 2012; and renewed by the City Commission via Resolution N...