File #: R-2026-303    Version: 1 Name: ATP H&S 26-11 WTP Membrane Operations Building Concrete Repairs
Type: Resolution Status: Agenda Ready
File created: 8/6/2026 In control: Department of Public Utilities
On agenda: 9/16/2026 Final action:
Title: A Resolution Of The City Commission Of The City Of Hollywood, Florida, Authorizing The Appropriate City Officials To Execute An Authorization To Proceed For Work Order No. H&S 26-11 With Hazen And Sawyer, P.C. For Design, Bidding Assistance, And Engineering Services During The Construction For The Membrane Operations Building Concrete Repairs Project At The Hollywood Water Treatment Plant In An Amount Not To Exceed $128,252.00; Amending The Fiscal Year 2026 Capital Improvement Plan.
Attachments: 1. Resolution - ATP HS 26-11 WTP Membrane Bldg Concrete Repairs (Legal), 2. Exhibit 1, 3. ATP H&S 26-11_ Membrane Operations Bldg Concrete Repairs WTP, 4. Membrane Operations Building Inspection Report, 5. Proposal WTP Membrane Concrete Repairs, 6. Consulting Agreement 1324A - Hazen and Sawyer PC, 7. R-2023-251 (Executed), 8. Term Sheet 2026
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

A Resolution Of The City Commission Of The City Of Hollywood, Florida, Authorizing The Appropriate City Officials To Execute An Authorization To Proceed For Work Order No. H&S 26-11 With Hazen And Sawyer, P.C. For Design, Bidding Assistance, And Engineering Services During The Construction For The Membrane Operations Building Concrete Repairs Project At The Hollywood Water Treatment Plant In An Amount Not To Exceed $128,252.00; Amending The Fiscal Year 2026 Capital Improvement Plan.

 

Strategic Plan Focus

Infrastructure & Facilites

 

 

Body

 

Staff Recommends:  Approval of the attached Resolution.

 

 

Explanation:

The Department of Public Utilities (“Department”) operates the City’s Water Treatment Plant (“WTP”), where the Membrane Operations Building, built in 1995, houses the reverse-osmosis and membrane-softening filtration systems, and the pipe gallery’s support pedestals.

 

During the Membrane Softening Plant Membrane Replacement project, staff noticed severe deterioration in the pedestals supporting the water filtration pipe gallery. Observed issues included cracking and concrete spalling, likely due to corrosion of the reinforcing steel in a highly corrosive environment.

 

Hazen and Sawyer, P.C., a consultant under the Department’s continuing services agreement, was engaged to perform a structural inspection of the Membrane Operations Building. The findings of the inspection are documented in the Structural Inspection Report dated March 4, 2026.

 

The objective of this project is to fully assess the extent of structural deterioration in the Membrane Operations Building, specifically the concrete pedestals, columns, and pipe support. The project will then prepare contract documents for competitive bidding of necessary concrete repairs at the WTP and provide engineering services throughout construction.

 

The Department requested and received a proposal from Hazen and Sawyer, P.C., for design services, bidding assistance, and engineering services during construction for the Membrane Operations Building Concrete Repairs project at the WTP. The proposed amount is not to exceed $128,252.00. The Department reviewed the proposal and found it reasonable and responsive.

 

The Department Director and the Chief Procurement Officer recommend that the City Commission approve and authorize the appropriate City officials to execute the attached Authorization to Proceed for Work Order No. H&S 26-11 with Hazen and Sawyer, P.C. in an amount not to exceed $128,252.00.

 

 

Fiscal Impact:

Funding for these services requires amending the approved FY 2026 Capital Improvement Plan as detailed in Exhibit 1, subject to approval of this resolution.

 

 

Recommended for inclusion on the agenda by:

Vincent Morello, Director, Public Utilities